Location: Ewen Cottages, Cotswolds
Sector: New Build / Contractor
Technology Installed: Enphase In-Roof Solar PV System
Installed: June 2025
The Challenge
For this new Cotswold-style development, the contractor needed to integrate renewable energy in a way that complemented the traditional architectural aesthetic while still delivering outstanding energy efficiency. The brief also demanded:
- Solutions for varied roof orientations and shading from trees
- Roof-integrated solar with minimal visual impact
- Strong EPC performance to meet planning requirements
- Full fire safety compliance for domestic installations
The Solution
Bright Spark Energy worked closely with the main contractor and design team to deliver a discreet, efficient solar PV system across three new-build homes. The Enphase micro-inverter solution was selected for its flexibility, safety, and ability to minimise shading losses.
System Components:
- 28 All-black solar panels with in-roof mounting kits across four roof faces
- 28 x Enphase IQ8HC Micro-Inverters
- 3 x Enphase IQ Gateways for system management and monitoring
- Real-time performance tracking via the Enphase mobile app
- Infrastructure ready for future battery storage and EV charging
This solution enabled seamless integration with the development’s Air Source Heat Pump (ASHP) systems and contributed toward achieving BREEAM A+ rating.

The Results
The installed solar systems significantly reduce the ongoing energy costs across the three properties, generating clean power to offset both electricity use and heating demand.
Key Benefits:
- Combined annual savings of £2,835
- Estimated payback period: under 7 years
- Carbon offset: 3,043 kg CO₂ per year
- Enhanced EPC ratings and property value
- Low-profile, architecturally sympathetic in-roof design
- Fully future-proof for EV and battery storage upgrades



What the Contractor Said
“Bright Spark were proactive from the design stage through to completion. Their understanding of aesthetic and technical constraints helped us deliver a seamless finish. They were very flexible to changes in the construction programme onsite.”
— Site Project Manager